DESIGN PROCESS
Below is an outline of how we work together to bring your project to life. While it illustrated in a straight line, the process almost never goes the way. Its an iterative process which leads us to a solution that is not know at the beginning. This is what makes it so exciting and enjoyable — we create a project together based on you specific needs and situation.
Predesign
- Program + Budget Analysis
- Client Questioare
- Existing Conditions Survey
- Zoning / Code Review
- Schedule
Before we move on: Program + Budget Approval
Schematic Design
- Preliminary Site Plan
- Preliminary Floor Plan(s)
- Preliminary Building Sections
- Preliminary Cost Estimate
Before we move on: SD Package + Preliminary Cost Estimate Approval
Design Development
- Site Plan
- Floor Plan(s)
- Building Sections
- Building Elevations
- Outline Specification
- Structural Concept
- MEP Concept
- Revised Cost Estimate
Before we move on: DD Package + Revised Cost Estimate Approval
- Technical Drawings
- Finish, Fixture, + Appliance Selection
- Hardware, Lighting, + Accessory Selection
- Construction Details
- Millwork Details
Before we move on: CD Package Approval
Construction Documents
- Contractor(s) provide pricing and schedule
- Negotiate proposals + award contract
- Obtain building permits
With a GC on board, its time to build.
Contractor Selection
Bidding + Negotiation
- Weekly site meetings
- Shop drawing approvals M
- Material finish + Product approvals
- Project close out + Punch list
The GC packs up and you get the keys